Our Technology


THE ARCHIMEDEAN SCREW GENERATOR

The Archimedes Screw has been pumping water for over 2000 years. By running them in reverse, the screw now offers a new method for generating power from water.

Archimedean Screw Turbines are well suited to this location with a high efficiency for low head operation (In this case some 2.1 metres).   Requiring only a coarse debris screen and automatic weir penstock to control the inlet flow, the screw turbine will be of visible benefit for educational purposes; it being on the Tutbury English Heritage Trail.

The existing fish ladder built by the Environment Agency (EA) in recent years, is already in place and provides a route for fish to get over the weir going upstream.  The Archimedean screw generator is fish-friendly and this will now provide a safe route down should they enter the inlet penstock channel.

In advance of the results of the consultation with EA and others in the near future, the construction detail is yet to be finally established.  However the necessary take off chamber and leat (channel) connecting the Dove upstream of the weir and the screw structure and equipment housing will be built to provide a safe viewing platform for visitors.  

The electricity generated will be fed directly into the national grid via a new pole mounted transformer feeding into the overhead 11kV local power distribution network close by.

Summary of Advantages


High overall efficiency, maintained across the large flow normally encountered in inland river systems

Fish friendly - Exhaustive tests by EA have proved this

Floating objects and debris simply pass through with no need for expensive fine screening

Robust, simple machinery - low maintenance

Design life: Up to 40 years with adequate maintenance

Control system is simple with the speed set automatically by the mains connection and the available flow.

Efficiency


Achieves an efficiency of up to 87%.

Overall efficiency of up to 77% has been independently verified.

Highly efficient down to 20% maximum flow - very flat efficiency/power curve

Generates usable power down to 15% of maximum flow.
   Generator  Gearbox
Inlet Channel
Outlet Channel
Descending discrete pockets of water - fish friendly